1 1 open secret gutter construction detail.
Pitched roof secret gutter detail.
Side abutment grp secret gutter.
In this video i will be installing an abutment soaker also known commonly as an abutment gutter or secret gutter.
This is a slightly unusual example as it s.
Lightweight easy to handle 3 metre lengths.
Dec 12 2019 explore walker workshop s board hidden gutters followed by 139 people on pinterest.
It is always important regardless of roof pitch to use the correct weathering detail at side abutments.
See more ideas about roof detail architecture details gutter.
The ridge side of the gutter can be treated as an eaves and is finished with an eaves tile course projecting 50mm over the gutter.
An alternative detail to using a step and cover flashing or continuous cover flashing with for flat interlocking roof tiles or without for profiled interlocking roof tiles grp secret gutter 9596 at a side abutment is to use an open secret gutter with a continuous or single step.
Fire tested to bs 476 3 2004.
Complies with bs 5534 2014.
Offers a secondary line of defence against wind driven rain where a roof slope abuts a vertical wall.
The gutter lining extends up the wall by at least 75mm above the top surface of the tiles and is covered by a step flashing.
Jan 19 2017 explore 柏均 林 s board gutter detail on pinterest.
Pitched roofs 7 2 7 2 21 valleys and hidden gutters valleys shall have suitable weathering details including flashings to resist the passage of moisture to the inside of the building.
See more ideas about gutters architecture details roof detail.
The secret box gutter runs horizontally across the roof usually about 300mm above the eaves.
Redland rapid flashing is a versatile flashing material that can replace lead in most pitched roofing applications including pitched valley and gutter details.
For double lapped slates and plain tiles use soakers for flat interlocking single lap tiles use a continuous secret gutter and for profile tiles use a cover flashing that extends at least 150mm over the tiles and covers one continuous roll.
Mt05 barge detail with secret gutter flat tile barge details 9 mt06 verge secret gutter barge details 10 mt07 verge no overhang scribed fillet barge details 10 mt08 verge no overhang concrete block barge details 11 mt09 flashing at junction of metal roof tile barge details 11 mt10 mansard detail pitch change details 20.
The tails of the eaves course tiles should be in line with the tails of the first course of full tiles above the gutter.
The gutter may be constructed in timber and usually lined with lead or other suitable material.