One of the reasons that shake siding is so popular is the way that it can give your home a rustic or retreat style r look.
Placing shaker siding at top of peak.
Attach the aluminum attachments to the uppermost edge of the top piece of siding using the crimping tool.
Start at the bottom of the wall at one end.
It should move smoothly.
Replace siding by working from the bottom up you might need a helper here.
Affix attachments every 6 8 inches to allow the siding to be flexible enough to expand and contract with heating changes.
The top of the step flashing is still under the siding or plaster.
Pop a level chalk line for the starter strip an inch or two above the bottom of the siding.
Push up gently until you hear a click.
When you replace the boards use a homemade reveal set jig to match the reveal of the existing siding.
Check out these seven design ideas for shake siding to help uncover the next look for your home.
Push the top of the vinyl siding with the tabs into the utility trim just enough to hold the edge and push the bottom against the second to last piece of siding.
You do have to trim the top starter course shingle with a triangle shaped cut to allow this.
Be sure the top and bottom click into place.
Align the thick lower edge of a cedar shake at the lower edge of the siding or shear wall.
On a wall to be covered with wood cement board vinyl or metal siding the step flashing and associated roofing must be installed first so the siding can cover the top of the step flashing on.
Put the bottom step flashing on the starter course then bend the bottom of the step flashing out about 1 to 1 away from the wall.
Installing vinyl shake siding.
Shake siding design ideas.
Once it is in place test by sliding the last piece back and forth slightly.
The courses should overlap by at least 1 in.
Attach the siding with 10d galvanized box nails driven into the overlap at least 1 2 in.
Nail the starter strip to the siding aligning the top of the strip with the chalk line.
Align one of the vertical edges at the edge of the trim or.
Start your siding at those points doing 3 4 rows at a time and use the level reference line to keep you straight.
Nail vertical vinyl corners to the corners of the house making sure they are plumb.